Files
OpsLog/frontend
rouggy dd7b63c059 fix(awards): stack the reference validity dates, and prove the award fallback
Two dates side by side put each one in a half-width Field2, which spends 120px
on its label column — the second label overlapped the first input and the row
ran off the panel. The comment ten lines above says exactly this about the
group/subgroup fields; one per row, as everything else in this editor.

Also shows a far-future end date as open-ended. RDA carries 9999-12-31 as "no
end" and printing it back reads like a real deadline.

The claim that an empty per-reference window inherits the award's is now a
test rather than a comment: a QSO before the award's own ValidFrom does not
count for a reference that has no window of its own, and a narrower reference
window still applies on top.
2026-08-12 10:51:12 +02:00
..
up
2026-06-07 21:44:49 +02:00
up
2026-06-07 21:44:49 +02:00
up
2026-06-07 21:44:49 +02:00