Files
OpsLog/internal
rouggy dd7b63c059 fix(awards): stack the reference validity dates, and prove the award fallback
Two dates side by side put each one in a half-width Field2, which spends 120px
on its label column — the second label overlapped the first input and the row
ran off the panel. The comment ten lines above says exactly this about the
group/subgroup fields; one per row, as everything else in this editor.

Also shows a far-future end date as open-ended. RDA carries 9999-12-31 as "no
end" and printing it back reads like a real deadline.

The claim that an empty per-reference window inherits the award's is now a
test rather than a comment: a QSO before the award's own ValidFrom does not
count for a reference that has no window of its own, and a narrower reference
window still applies on top.
2026-08-12 10:51:12 +02:00
..
2026-08-02 20:03:16 +02:00
2026-07-03 19:08:50 +02:00
2026-07-04 11:39:33 +02:00
2026-08-02 23:51:46 +02:00
2026-08-10 23:40:42 +02:00
2026-08-02 23:51:46 +02:00
up
2026-06-15 23:45:14 +02:00
2026-06-07 01:11:37 +02:00
2026-06-11 21:54:35 +02:00
up
2026-06-15 23:45:14 +02:00
2026-07-09 17:32:13 +02:00
2026-07-26 16:57:19 +02:00
2026-08-02 06:40:10 +02:00
2026-07-26 16:57:19 +02:00